The paper published in Coal Technology (2009, Vol. 28, No. 2, pp. 24–26) by Wang Qiang and Meng Rongyan from Wanbei Coal Electricity Group presents a practical field-level solution for repairing active columns (piston rods) of hydraulic jacks used in fully mechanized coal mining equipment. The authors analyze the failure mechanisms of these critical components and propose a submerged arc welding (SAW) surfacing process as an alternative to conventional replacement strategies. This work is significant not only for its technical content but also for its economic reasoning—minimizing waste in capital-intensive mining machinery maintenance.

Failure Mechanism Analysis

Active columns of hydraulic jacks in fully mechanized mining systems are subjected to extreme cyclic loading, abrasive contact with coal and rock debris, and occasional impact events. The primary failure modes include:

The original columns are typically manufactured from alloy steel (commonly 40Cr or 42CrMo) with a chromium-plated working surface. When the plating is damaged or the base metal is worn beyond tolerance, conventional practice has been to replace the entire column, which is economically wasteful given the cost of high-grade alloy steel forgings.

Submerged Arc Surfacing Process Description

The proposed repair method involves the following sequential steps:

  1. Surface preparation: The damaged area is ground down to sound metal, removing all oxide, scale, and plating residue. A transition fillet is machined to ensure gradual blending of the surfacing layer with the parent material.
  2. Preheating: The component is preheated to 150–250°C using induction heating or gas torch, depending on the base steel grade and section thickness.
  3. SAW surfacing: A single-pass or multi-pass submerged arc process is applied using a suitable flux-cored or solid wire electrode. The process parameters are optimized for dilution control and penetration depth.
  4. Post-weld treatment: The surfaced area is machined to the required dimensional tolerance and subsequently chrome-plated and polished to restore the original surface finish and hardness profile.

Typical Process Parameters

Parameter Value Range Notes
Welding current 350–500 A Depends on wire diameter
Welding voltage 28–34 V Maintains arc stability
Travel speed 300–500 mm/min Adjusted for deposition rate
Wire diameter φ1.6–φ2.0 mm Solid or flux-cored
Flux type HJ431 or equivalent Low-hydrogen flux
Preheat temperature 150–250°C For 40Cr/42CrMo base
Interpass temperature ≤250°C Prevents HAZ softening

Technical Discussion and Critical Insights

From a metallurgical perspective, the submerged arc process offers several advantages for this application. The flux provides excellent slag coverage, resulting in reduced spatter and minimal nitrogen and oxygen pickup compared to open-arc processes. This is particularly important when the surfaced layer must subsequently accept electroplating, as any porosity or oxidation in the weld deposit would compromise adhesion of the chrome layer.

However, several critical considerations must be addressed in practice:

Engineering Practice Considerations

The economic analysis presented in the paper is compelling. A typical active column replacement costs significantly more than the material and labor for SAW repair followed by re-plating. The process is particularly well-suited to maintenance workshops that already possess SAW equipment for structural welding operations.

The method is applicable to various hydraulic jack sizes found in fully mechanized mining equipment, including shield jacks, support jacks, and advance jacks. The key limitation is that the repair is only viable when the base metal remaining after grinding is sufficient to support the surfacing layer—typically requiring at least 3–5 mm of sound material beneath the surfacing deposit.

Study Insights

This paper exemplifies the practical engineering philosophy that often dominates Chinese industrial literature—solving real problems with available technology rather than pursuing theoretical optimization. The submerged arc surfacing approach is not novel in principle, but its application to hydraulic jack repair in mining environments represents a valuable case study in cost-effective maintenance engineering. The integration of welding repair with subsequent surface engineering (chrome plating and polishing) demonstrates a systems-thinking approach to component restoration.