ZHUOJIN-LOGOZhuojin Pipe Fitting Co., Ltd
Zhuojin Pipe Fitting Co., Ltd
STEEL PIPE · FITTING · WELDING TECHNICAL STUDY

Construction Technology of Horizontal Main Pipe Concrete in Steel Tube Concrete Truss Bridge in Plateau Mountainous Area

Literature Overview

This study addresses the construction challenges of pouring concrete into the horizontal main pipe (chord member) of steel tube concrete truss bridges located in high-altitude plateau mountainous regions. The research is highly relevant to steel pipe fabrication, welding, and quality control, as the horizontal main pipe is typically a large-diameter welded steel pipe that must withstand significant bending and axial loads while accommodating the concrete infill under challenging environmental conditions.

Core Technical Content and Key Findings

The horizontal main pipe in a truss bridge chord member is usually a large-diameter steel pipe, often in the range of 600 mm to 2000 mm in outer diameter, fabricated from longitudinal submerged arc welded (LSAW) or hot-finished seamless steel pipe. The concrete infill must be placed horizontally, which presents unique challenges compared to vertical column applications. In plateau mountainous areas, the low atmospheric pressure, low temperatures, and short construction seasons further complicate the concrete placement and curing processes.

The study likely investigates concrete mix design optimization for horizontal pipe placement, pumping and flowability requirements, vibration methods for consolidation, and curing strategies under low-pressure conditions. From a welding perspective, the integrity of the pipe fabrication welds, particularly the longitudinal weld seam, is critical because any defects in the weld could lead to leakage during concrete placement or reduced structural capacity.

Interpretation of Technical Points

Concrete placement in horizontal steel pipes requires specialized techniques to ensure complete filling without voids. The concrete must have sufficient flowability to fill the pipe length, which can range from 10 m to 30 m per segment, while maintaining adequate strength after curing. The use of self-compacting concrete (SCC) or pumpable concrete with superplasticizers is common, but the mix design must account for the low atmospheric pressure at altitude, which affects the entrained air content and setting time of the concrete.

The welding of the steel pipe segments, whether at the fabrication shop or in the field, must be performed to a high standard. For LSAW pipes, the longitudinal weld seam is the weakest link and must be inspected using ultrasonic testing (UT) in accordance with standards such as GB/T 11345 or ISO 17637. Any indications of lack of fusion, slag inclusion, or porosity must be repaired before the pipe is filled with concrete.

Process and Standards Analysis

Parameter Typical Specification Relevant Standard
Pipe outer diameter 600 mm to 2000 mm GB/T 9711, API 5L
Pipe wall thickness 12 mm to 40 mm GB/T 9711
Steel grade Q345, Q355, X65 GB/T 1591, EN 10216-2
Longitudinal weld process SAW GB/T 9916, ISO 15614
Weld inspection UT + RT GB/T 11345, GB/T 3323
Concrete grade C40 to C60 GB/T 50081
Concrete slump 180 mm to 220 mm GB/T 50080
Altitude effect on pressure 60 kPa to 90 kPa GB/T 19001
Curing temperature -10°C to 30°C GB/T 50204

Integration with Engineering Practice

In plateau mountainous construction, the low atmospheric pressure affects the boiling point of water, which can lead to premature evaporation of water from the concrete mix during placement. This necessitates the use of retarders and accelerators in the mix design to control setting time and ensure adequate workability throughout the placement duration. The welding procedures must also be adapted for the altitude, as the reduced oxygen partial pressure can affect the arc stability and weld pool dynamics in gas-shielded welding processes.

Quality control during construction should include pre-placement inspection of the pipe interior for cleanliness and weld repair verification, in-situ monitoring of concrete placement progress using sensors or acoustic methods, and post-hardening testing of the concrete through embedded cores or end-face testing. The longitudinal weld seam, being the most critical feature, should be inspected both before and after concrete placement if feasible, with any defects documented and repaired according to the applicable repair procedure.

Key Questions and Reflections

The most pressing question is how to ensure complete concrete filling in long horizontal pipes without voids, particularly in the upper portion where air entrapment is most likely. Another consideration is the thermal contraction of the steel pipe during curing, which could induce stresses at the steel-concrete interface and potentially lead to debonding. The welding quality of the pipe fabrication joints is paramount, as any hidden defect could compromise the structural integrity of the entire chord member. Engineers must also consider the long-term durability of the concrete-steel interface under cyclic loading and environmental exposure in the plateau climate.

Study Insights and Implications

This research provides practical guidance for the construction of steel tube concrete truss bridges in challenging high-altitude environments. The findings emphasize the need for integrated design and construction planning that accounts for the interaction between steel pipe fabrication quality, concrete placement methodology, and environmental conditions. Engineers should prioritize the development of site-specific welding procedure specifications (WPS) and concrete mix designs that are validated through full-scale testing before deployment. The study highlights the importance of interdisciplinary collaboration between welding engineers, concrete technologists, and structural engineers in ensuring the success of complex steel tube concrete bridge projects.