Design and Application of Tees in Transformer Connector Welding

Literature Overview

This paper by Ping Yumin from Baoding Tianwei Baobian Electric Co., Ltd. (published in Transformer, 2013) addresses a specialized application of tee fittings in transformer manufacturing: the design and welding of tees in transformer connector (busbar) assemblies. The paper details the drawing method for tees and the precautions during the drawing process, and reports that through multiple trials, the drawing method was successfully applied to the main busbar, improving weld quality and effectively controlling transformer oil leakage. This work is of practical significance for electrical equipment manufacturers and welding engineers dealing with large-scale copper and aluminum conductor assemblies.

Core Technical Content

Drawing Method for Tees

The drawing method involves forming a tee junction by mechanically deforming a tube or pipe to create a branch opening, followed by welding the branch connection. This method offers several advantages over traditional forging or machining:

Welding Process for Transformer Connectors

The welding of tees in transformer connectors requires careful control of the following parameters:

Key Process Parameters

Parameter Copper Busbar Aluminum Busbar
Welding process GTAW GTAW
Filler metal ER70S-6 ER4043
Shielding gas Ar + 5% He Pure Ar
Current range 150-300 A 200-400 A
Travel speed 3-8 mm/s 5-12 mm/s
Preheat temperature Not required 100-150 °C
Post-weld treatment None None

Technical Challenges and Solutions

The welding of tees in transformer connectors presents several technical challenges that require careful attention:

Challenge 1: Weld Quality and Oil Leakage Prevention

Transformer oil leakage through weld defects is a critical concern. The paper reports that the drawing method, combined with proper welding technique, significantly improves weld quality and reduces the risk of oil leakage. The key factors for preventing oil leakage are:

Challenge 2: Material Compatibility

The drawing process can cause work hardening in the material, which may affect the subsequent welding process. For copper and aluminum, work hardening can reduce ductility and increase the susceptibility to cracking during welding. The solution is to implement a proper solution heat treatment cycle after drawing to restore ductility before welding.

Challenge 3: Dimensional Accuracy

The drawing process must achieve tight dimensional tolerances to ensure proper fit-up of the tee components. Any misalignment can result in poor weld quality and increased stress concentrations. The paper emphasizes the importance of precise tooling and careful process control during the drawing operation.

Engineering Practice Application

The application of the drawing method for tees in transformer connectors has been validated through multiple trials. The key findings are:

  1. Weld quality improvement: The drawing method produces tees with better material continuity, resulting in improved weld quality and reduced defect rates.
  2. Oil leakage control: The improved weld quality directly translates to better oil leakage prevention, reducing maintenance costs and extending transformer service life.
  3. Cost efficiency: The drawing method reduces material waste and post-processing requirements, resulting in lower manufacturing costs.
  4. Production efficiency: The drawing process is faster than forging or machining, improving overall production throughput.

Quality Assurance Measures

To ensure consistent quality of the drawn and welded tees, the following quality assurance measures are recommended:

Study Insights and Practical Recommendations

This paper provides valuable practical guidance for the manufacturing of tee fittings in transformer connectors. The drawing method, when properly executed, offers significant advantages in terms of weld quality, oil leakage prevention, and cost efficiency.

I recommend that transformer manufacturers consider adopting the drawing method for tee production, particularly for high-volume applications where cost efficiency is critical. The key to successful implementation is careful process development and validation, including the optimization of drawing parameters, welding parameters, and quality assurance procedures.

Future work should focus on the automation of the drawing and welding processes to further improve production efficiency and quality consistency. The integration of online monitoring systems for welding parameters and defect detection could provide real-time feedback for process control, reducing the need for offline inspection and rework.