This paper, published in Forging & Stamping Technology (2017, Vol. 42, No. 1, pp. 15–19), authored by Ren Xiaohong, Chen Li, and Gao Zhaoxiang from Sichuan Chemical College and Luzhou Huaxi Machinery Co., Ltd., presents a process innovation in the forging of right-angle elbows. The traditional one-die-one-piece forging method is improved to a one-die-two-pieces configuration, with the aid of Deform-3D finite element simulation for process optimization. The study demonstrates significant improvements in production efficiency, die life, and cost reduction.

Traditional Process Limitations

The conventional one-die-one-piece forging process for right-angle elbows involves placing a single preformed billet into the die cavity, applying forging force, and extracting one finished elbow per cycle. This approach has several inherent limitations:

The production economics of the traditional method become particularly unfavorable for high-volume manufacturing scenarios where the per-unit cost must be minimized.

One-Die-Two-Pieces Process Design

The improved process places two billets side by side within a single die set, doubling the output per forging cycle. The design of this improved process involves several critical considerations:

Billet Arrangement and Die Geometry

The two billets are arranged parallel to each other within the die cavity, with a carefully calculated spacing between them. The key design parameters include:

Design Parameter Traditional (1-piece) Improved (2-pieces) Design Rationale
Billets per cycle 1 2 Doubled output
Die cavity spacing N/A Calculated for even flow Prevent inter-billet interference
Billet shape Single preform Modified preform Optimized for two-piece filling
Flash distribution Single flash Shared flash Reduced material waste
Forging force per cycle Baseline Higher (2× billets) Requires adequate press capacity

Finite Element Simulation with Deform-3D

The Deform-3D software was employed to simulate the forging process, providing insights into material flow, stress distribution, and cavity filling behavior. The simulation model was constructed with the following parameters:

The simulation results provided the load-stroke curve and equivalent stress distribution at the end of forming, confirming that the cavity was fully filled and the material flow was reasonable throughout the forging process.

Performance Comparison and Results

The quantitative comparison between the traditional and improved processes reveals substantial improvements:

Performance Metric Traditional Process Improved Process Improvement Factor
Production efficiency Baseline 5× 500% increase
Die service life Baseline ~2× 100% increase
Cost per 3000 pieces Baseline 8,230 CNY savings Significant reduction
Material utilization Lower Higher Reduced waste
Labor requirement Higher Lower Improved ergonomics

The fivefold increase in production efficiency is the most striking result, directly attributable to doubling the output per cycle while maintaining comparable cycle times. The doubling of die life is attributed to more uniform stress distribution across the die surface when two symmetrically arranged billets are forged simultaneously, reducing localized wear patterns.

Engineering Practice Considerations

For engineers considering the implementation of one-die-two-pieces forging for similar applications, several practical considerations must be addressed:

Key Reflections and Study Insights

This paper demonstrates the power of process innovation combined with numerical simulation in achieving substantial manufacturing improvements. The concept of increasing the number of pieces per die cycle is straightforward in principle but requires careful engineering analysis to ensure that the benefits are realized without compromising quality. The successful application of Deform-3D simulation in validating the process before production trial is a best practice that reduces the risk and cost of process development.

The 8,230 CNY cost savings per 3,000 pieces represents a compelling economic case for process improvement, particularly in high-volume production environments. For engineers in the pipe fitting manufacturing industry, this work reinforces the principle that incremental process innovations, when properly analyzed and implemented, can yield significant competitive advantages in terms of cost, quality, and delivery performance.